14: trucking

Back from vacation now. The lifting shaft (blue) is finished and is now connected to the links via the lifting links.

Now, time for something a bit different. Here’s start of the truck assembly, with the equalizing bars connected to the axle boxes.

Leave a Comment

Filed under CK Holliday build

Leave a Reply

Your email address will not be published. Required fields are marked *